Playtime Learning Academy

Fast-Track Demolition of existing Classroom Building and construction of a new 7,125 S.F. 2-Storey Classroom Building utilizing a Gulf States Manufacturing 76’-4” x 46’-8” Pre-Engineered Metal Building Structural Steel Framing System with Metal-Span 26 Ga. 2” Insulated Stucco Embossed Wall Panels with 26 Ga. Liner Panel at Exterior Walls, Metal Bar Joists and Galvanized Decking System at Second Floor, Site Work, Underground Utilities, On-Site Retention and Storm Drainage, Concrete First Floor System with Concrete Stem Walls and Footings, Concrete Curbs, Sidewalks, and Pads, Landscaping and Irrigation, Asphalt Parking Lot and Pervious Pavers, Signage and Striping, Light Gauge and Structural Metal Studding systems, Fire-Rated Gypsum Wall Board Partitions and Walls, Light-weight Concrete Floor and Decks, Hollow Metal Doors and Frames, Wood and Rated Entry Doors with required Hardware, Cabinetry, Appliances, insulated 2 by 2 Acoustical Ceiling System, Wall Finishes, Floor Coverings, Steel Stairs and Railings, Playground Equipment, Fencing, Specialties, HVAC and Fire-Suppressant Kitchen Hood, Plumbing and Fixtures, Electrical and Site-Lighting, Fire Alarm and Security System, Intercom System.

Click on images below to view larger image.

  Images Coming Soon!  

Back to Projects